Starbase Aerial Archive

Year: 2021


Subject: OLM


The Chopstix have been installed.

2021/10/26: OLM Stix


Moving a little into the future, we have this picture from October 18th where the Chopsticks were integrated, they got installed two days later on October 20th

2021/10/18: OLM


2021/9/24: Booster 4 on OLM


2021/9/24: OLIT Chopsticks


2021/9/21: OLM, OLIT, B4


2021/9/9: B4 on the OLM


The QD Arm got lifted and installed onto the Tower, this was a big step towards completing the Tower Systems for full stack testing and future launches.

2021/9/3: OLM


The Claw. This is an early idea to help stabilise the full stack by attaching the Ship Quick Disconnect Arm to the Lifting Pins at the top of the Booster. It was only used couple of times and then it was removed.

2021/9/3: The Claw


2021/8/19: OLM and Tower


S20 on top left

2021/8/13: OLM Overhead


2021/8/13: OLM and S20


2021/8/4: B4 Lifted on OLM


2021/6/5: OLIT 4th Level


2021/6/5: OLM Elbow Joints


2021/5/25: OLM and OLIT Level 2


2021/5/25: OLM Table


Was lifted the day before

2021/5/25: OLIT Section 2


2021/5/21: OLIT First Segment


2021/4/21: OLIT First Level


OLM Area.
SN8 on the Landing Pad.

2021/1/1: OLM